Technische installaties in gebouwen
Prison de Termonde
La prison de Termonde
Hot Water:
- 6 condensing boilers with a total capacity of 1,612 kW
- A cogeneration plant with a thermal output of 209 kW, connected to 2 buffer tanks of 2,500 L each
Cold Water:
- 3 air-cooled chillers with a total cooling capacity of 640 kW
Ventilation:
- 20 air handling units with a total air flow of 167,000 m³/h
- 723 m² of underfloor heating
Similarly, the electrical installations were designed to be efficient and minimize energy consumption, including:
- 4 high-voltage substations equipped with redundant transformers, offering a combined capacity of >5 MVA
- 2 backup generators of 500 kVA each
- CCTV installation with nearly 700 cameras (PTZ, dome, and thermal cameras)
- Access control (+/- 1,200 controlled access points)
- Control and intervention station
- Perimeter detection
- DECT system with alarm notification and localization
- Fire detection system
- ASTRID communication system
- UPS installation
- 774 solar panels with a total power output of 290.25 kWp
- Structured cabling and active switching for various security networks